CO2 recovery starts with the feeding of the flue gas from the methanol stack at 206°C into the CDR unit.
-
GPIC's new facility has the capacity to produce 450t a day of carbon dioxide... -
GPIC came up with the CDR project in 2006 to increase the production capacity... -
The carbon dioxide recovery facility is fitted with its own incinerator for... -
CO2 recovery starts with the feeding of the flue gas...